← Back to Fife
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Duniface Gas Peaking Plant - Battery Energy Storage System

Operator Forsa Energy Gas Holdings Limited · Owner Beryl Street Generation Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 8 October 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Duniface Gas Peaking Plant - Battery Energy Storage System is a 49.9 MW battery storage site on the edge of Methil, Fife, United Kingdom. Its planning application (24/00713/FULL) went to Fife on 2 May 2024 and was granted on 26 September 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 38 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

BERYL STREET GENERATION LIMITED (SC573847), active, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Duniface Gas Peaking Plant - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 312 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool312 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells364 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire504 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Forsa Energy Gas Holdings Limited
Owner
Beryl Street Generation Limited
Location
Duniface Gas Peaking Plant, Duniface Farm, Leven, Fife, KY8 5RH, United Kingdom
Planning authority
Fife
Planning application
24/00713/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00713/FULL, with what the planning evidence pack adds for this site.

Every application in Fife · Alerts for applications and incidents near here

  • 26 September 2022 Planning permission expired
  • 2 May 2024 Planning application submitted
  • 26 September 2024 Planning permission granted

None found. The register holds no published incident that names Duniface Gas Peaking Plant - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Duniface Gas Peaking Plant - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Duniface Gas Peaking Plant - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Duniface Gas Peaking Plant - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 October 2024.
Where is Duniface Gas Peaking Plant - Battery Energy Storage System?
On the edge of Methil, Fife, United Kingdom (postcode KY8 5RH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).