← Back to Offshore
Planning pack for this site, £295Other options

Offshore wind · United Kingdom

Dudgeon Extension Project

Operator Equinor

Awaiting Construction402 MWData checked 16 November 2026Source record dated 11 January 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dudgeon Extension Project is a 402 MW offshore wind farm 23 km north of Sheringham, United Kingdom. Its planning application (EN010109) went to The Planning Inspectorate - National Infrastructure on 5 September 2022 and was granted on 18 April 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dudgeon Extension Project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 14 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0447, Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023, 71 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-04472023Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 202371 kmMajor
EIR-00292024Second blade failure of 2024 at Dogger Bank A offshore wind farm263 kmSignificant
EIR-07582024Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm263 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 11 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Offshore wind
Capacity
402 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Equinor
Location
Offshore, north and southeast of Dudgeon OFW, Offshore, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010109
Turbines
34, 326 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010109, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 5 September 2022 Planning application submitted
  • 18 April 2024 Planning permission granted

None found. The register holds no published incident that names Dudgeon Extension Project. If you know of one, report it (confidential reports are anonymised).

Has Dudgeon Extension Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dudgeon Extension Project; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Dudgeon Extension Project?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 January 2024.
Where is Dudgeon Extension Project?
23 km north of Sheringham, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).