Solar · United Kingdom

Duddingston Solar Farm and Battery Storage

Operator Aithrie Net Zero Solar Limited · Owner Ase UK Holdings Limited

Awaiting Construction29.9 MWData checked 16 November 2026Source record dated 8 April 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Duddingston Solar Farm and Battery Storage is a 29.9 MW solar farm on the edge of Queensferry, Lothian, United Kingdom. Its planning application (1016/FUL/23) went to West Lothian on 11 January 2024 and was granted on 3 April 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ASE UK HOLDINGS LIMITED (13412982), active, since 2021. 5 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Duddingston Solar Farm and Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 290 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool290 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells352 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire485 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
29.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Aithrie Net Zero Solar Limited
Owner
Ase UK Holdings Limited
Location
Duddingston, Newton, South Queensferry, Lothian, EH30 9SN, United Kingdom
Planning authority
West Lothian
Planning application
1016/FUL/23

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 1016/FUL/23, with what the planning evidence pack adds for this site.

Every application in West Lothian · Alerts for applications and incidents near here

  • 11 January 2024 Planning application submitted
  • 3 April 2024 Planning permission granted
  • 3 April 2027 Planning permission runs out

None found. The register holds no published incident that names Duddingston Solar Farm and Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Duddingston Solar Farm and Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Duddingston Solar Farm and Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Duddingston Solar Farm and Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 April 2024.
Where is Duddingston Solar Farm and Battery Storage?
On the edge of Queensferry, Lothian, United Kingdom (postcode EH30 9SN).