Planning pack for this site, £295Other options

Solar · Germany

DORN022 (Ibbenbüren)

Operator Fiege Energy Solutions GmbH

Planned1.9 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

DORN022 (Ibbenbüren) is a 1.9 MW solar farm 3.1 km north-east of Hörstel, Germany. It first operated in 2026. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 20 other energy sites within 10 km, 5 of them solar farms. The register holds no incident at this site. It holds 6 incidents at solar farms in Germany, and 458 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for DORN022 (Ibbenbüren) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 6 comparable solar incidents in Germany, nearest first. The nearest is EIR-2629, Fire breaks out in technical room of Hesse solar park, 229 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-26292024Fire breaks out in technical room of Hesse solar park229 kmSignificant
EIR-13282026Battery storage fire at solar installation in Reichenbachnot mappedSignificant
EIR-28392026Battery storage at solar park near Schnaittenbach, Germany, burns outnot mappedSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 3 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.9 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Fiege Energy Solutions GmbH
Location
Hörstel, Steinfurt, Nordrhein-Westfalen, 49479, Germany
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names DORN022 (Ibbenbüren). If you know of one, report it (confidential reports are anonymised).

Has DORN022 (Ibbenbüren) had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names DORN022 (Ibbenbüren); it holds 6 incidents at solar farms in Germany.
What is the status of DORN022 (Ibbenbüren)?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is DORN022 (Ibbenbüren)?
3.1 km north-east of Hörstel, Germany (postcode 49479).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).