Planning pack for this site, £295Other options

Solar · Germany

Dorfenergiegenossenschaft Mellen - Auf dem Stücke -

Operator Dorfenergiegenossenschaft Mellen eG

Planned2.4 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dorfenergiegenossenschaft Mellen - Auf dem Stücke - is a 2.4 MW solar farm on the edge of Balve, Germany. It first operated in 2024. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 14 other energy sites within 10 km. The register holds no incident at this site. It holds 6 incidents at solar farms in Germany, and 456 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dorfenergiegenossenschaft Mellen - Auf dem Stücke - sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 6 comparable solar incidents in Germany, nearest first. The nearest is EIR-2629, Fire breaks out in technical room of Hesse solar park, 140 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-26292024Fire breaks out in technical room of Hesse solar park140 kmSignificant
EIR-13282026Battery storage fire at solar installation in Reichenbachnot mappedSignificant
EIR-28392026Battery storage at solar park near Schnaittenbach, Germany, burns outnot mappedSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 3 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
2.4 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Dorfenergiegenossenschaft Mellen eG
Location
Balve, Märkischer Kreis, Nordrhein-Westfalen, 58802, Germany
First operating
2024

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Dorfenergiegenossenschaft Mellen - Auf dem Stücke -. If you know of one, report it (confidential reports are anonymised).

Has Dorfenergiegenossenschaft Mellen - Auf dem Stücke - had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names Dorfenergiegenossenschaft Mellen - Auf dem Stücke -; it holds 6 incidents at solar farms in Germany.
What is the status of Dorfenergiegenossenschaft Mellen - Auf dem Stücke -?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Dorfenergiegenossenschaft Mellen - Auf dem Stücke -?
On the edge of Balve, Germany (postcode 58802).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).