Solar · United Kingdom

DHL Supply Chain, Pendeen Crescent -Solar Panels

Operator GLP Capital

Awaiting Construction1.2 MWData checked 16 November 2026Source record dated 16 August 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

DHL Supply Chain, Pendeen Crescent -Solar Panels is a 1.2 MW solar farm 3.3 km west of Bletchley, Buckinghamshire, United Kingdom. Its planning application (24/01291/PRIOR) went to Milton Keynes on 7 June 2024 and was granted on 22 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 106 other energy sites within 10 km, 61 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for DHL Supply Chain, Pendeen Crescent -Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1493, Solar panels catch fire on Bedford warehouse roof, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14932026Solar panels catch fire on Bedford warehouse roof30 kmMinor
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough35 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering45 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
GLP Capital
Location
Dhl Supply Chain 2 Pendeen Crescent Snelshall East, Buckinghamshire, MK4 3FU, United Kingdom
Planning authority
Milton Keynes
Planning application
24/01291/PRIOR

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01291/PRIOR, with what the planning evidence pack adds for this site.

Every application in Milton Keynes · Alerts for applications and incidents near here

  • 7 June 2024 Planning application submitted
  • 22 July 2024 Planning permission granted

None found. The register holds no published incident that names DHL Supply Chain, Pendeen Crescent -Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has DHL Supply Chain, Pendeen Crescent -Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names DHL Supply Chain, Pendeen Crescent -Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of DHL Supply Chain, Pendeen Crescent -Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 August 2024.
Where is DHL Supply Chain, Pendeen Crescent -Solar Panels?
3.3 km west of Bletchley, Buckinghamshire, United Kingdom (postcode MK4 3FU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).