← Back to Merseyside
Planning pack for this site, £295Other options

Solar · United Kingdom

David Lloyd Leisure, Arbour Lane - Solar Panels

Operator David Lloyd Leisure Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 23 August 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

David Lloyd Leisure, Arbour Lane - Solar Panels is a solar farm on the edge of Kirkby, Merseyside, United Kingdom. Its planning application (23/01307/PDS) went to Knowsley on 19 June 2023 and was granted on 9 August 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 93 other energy sites within 10 km, 49 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

DAVID LLOYD LEISURE LIMITED (01516226), active, since 1980. 5 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for David Lloyd Leisure, Arbour Lane - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 23 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school23 kmSignificant
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent65 kmMinor
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire69 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
David Lloyd Leisure Limited
Location
Arbour Lane, Knowsley Industrial Park, Liverpool, Merseyside, L33 7XB, United Kingdom
Planning authority
Knowsley
Planning application
23/01307/PDS

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/01307/PDS, with what the planning evidence pack adds for this site.

Every application in Knowsley · Alerts for applications and incidents near here

  • 19 June 2023 Planning application submitted
  • 9 August 2023 Planning permission granted

None found. The register holds no published incident that names David Lloyd Leisure, Arbour Lane - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has David Lloyd Leisure, Arbour Lane - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names David Lloyd Leisure, Arbour Lane - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of David Lloyd Leisure, Arbour Lane - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 August 2023.
Where is David Lloyd Leisure, Arbour Lane - Solar Panels?
On the edge of Kirkby, Merseyside, United Kingdom (postcode L33 7XB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).