Planning pack for this site, £295Other options

Solar · United Kingdom

Crown Farm Way - Solar Photovoltaic

Operator Mansfield Sand Company Limited

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 11 March 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Crown Farm Way - Solar Photovoltaic is a 0.3 MW solar farm 3.5 km south-east of Mansfield Woodhouse, Nottinghamshire, United Kingdom. Its planning application (2022/0139/PNSRE) went to Mansfield on 28 February 2022 and was granted on 5 October 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 43 other energy sites within 10 km, 32 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Crown Farm Way - Solar Photovoltaic sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1265, Solar panels catch fire and destroy three buildings in Harby, 35 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12652024Solar panels catch fire and destroy three buildings in Harby35 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster38 kmSignificant
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge57 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Mansfield Sand Company Limited
Location
Plot 6 Crown Farm Way Forest Town, Nottinghamshire, NG19 0FT, United Kingdom
Planning authority
Mansfield
Planning application
2022/0139/PNSRE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2022/0139/PNSRE, with what the planning evidence pack adds for this site.

Every application in Mansfield · Alerts for applications and incidents near here

  • 28 February 2022 Planning application submitted
  • 5 October 2022 Planning permission granted

None found. The register holds no published incident that names Crown Farm Way - Solar Photovoltaic. If you know of one, report it (confidential reports are anonymised).

Has Crown Farm Way - Solar Photovoltaic had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Crown Farm Way - Solar Photovoltaic; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Crown Farm Way - Solar Photovoltaic?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 March 2022.
Where is Crown Farm Way - Solar Photovoltaic?
3.5 km south-east of Mansfield Woodhouse, Nottinghamshire, United Kingdom (postcode NG19 0FT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).