Battery storage · United Kingdom

Crown Business Park, Cowm Top Lane, Unit 7 - Energy Storage System

Operator AMP Clean Energy · Owner Aggregated Micro Power Holdings Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 22 September 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Crown Business Park, Cowm Top Lane, Unit 7 - Energy Storage System is a 0.2 MW battery storage site on the edge of Rochdale, Lancashire, United Kingdom. Its planning application (PL/2026/0537) went to Rochdale on 30 June 2026 and was granted on 25 August 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 67 other energy sites within 10 km, 24 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

AMP CLEAN ENERGY LIMITED (11320925), active, since 2018. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Crown Business Park, Cowm Top Lane, Unit 7 - Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 54 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool54 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells87 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire210 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
AMP Clean Energy
Owner
Aggregated Micro Power Holdings Limited
Location
Unit 7 Crown Business Park, Cowm Top Lane, Lancashire, OL11 2PU, United Kingdom
Planning authority
Rochdale
Planning application
PL/2026/0537

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2026/0537, with what the planning evidence pack adds for this site.

Every application in Rochdale · Alerts for applications and incidents near here

  • 30 June 2026 Planning application submitted
  • 25 August 2026 Planning permission granted
  • 25 August 2029 Planning permission runs out

None found. The register holds no published incident that names Crown Business Park, Cowm Top Lane, Unit 7 - Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Crown Business Park, Cowm Top Lane, Unit 7 - Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Crown Business Park, Cowm Top Lane, Unit 7 - Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Crown Business Park, Cowm Top Lane, Unit 7 - Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 22 September 2026.
Where is Crown Business Park, Cowm Top Lane, Unit 7 - Energy Storage System?
On the edge of Rochdale, Lancashire, United Kingdom (postcode OL11 2PU).