Solar · United States
Crimson Orchard Solar and BESS
Operator Clenera DevCo LLC
Planned100 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Crimson Orchard Solar and BESS is a 100 MW solar farm 7 km north-west of Mountain Home, Elmore County, Idaho, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There are 3 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when Crimson Orchard Solar and BESS changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Crimson Orchard Solar and BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-0653, Battery storage fire burns for days at Idaho Power substation near Melba, 67 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0653 | 2023 | Battery storage fire burns for days at Idaho Power substation near Melba | 67 km | Significant |
| EIR-0666 | 2019 | Fire during new product testing of Powin batteries in Tualatin, Oregon | 610 km | Significant |
| EIR-0382 | 2026 | Transformer explosion at California battery storage site triggers mass outage | 711 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 100 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Planned
- Operator
- Clenera DevCo LLC
- Owner
- Clenera DevCo LLC
- Location
- Elmore County, Idaho, United States
- Expected
- 2027
- Balancing authority
- IPCO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Crimson Orchard Solar and BESS. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Crimson Orchard Solar and BESS had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Crimson Orchard Solar and BESS; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of Crimson Orchard Solar and BESS?
- Planned, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Crimson Orchard Solar and BESS?
- 7 km north-west of Mountain Home, Elmore County, Idaho, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).