Solar · United States

Crimson Orchard Solar and BESS

Operator Clenera DevCo LLC

Planned100 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Crimson Orchard Solar and BESS is a 100 MW solar farm 7 km north-west of Mountain Home, Elmore County, Idaho, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There are 3 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Crimson Orchard Solar and BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-0653, Battery storage fire burns for days at Idaho Power substation near Melba, 67 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06532023Battery storage fire burns for days at Idaho Power substation near Melba67 kmSignificant
EIR-06662019Fire during new product testing of Powin batteries in Tualatin, Oregon610 kmSignificant
EIR-03822026Transformer explosion at California battery storage site triggers mass outage711 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
100 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
Clenera DevCo LLC
Owner
Clenera DevCo LLC
Location
Elmore County, Idaho, United States
Expected
2027
Balancing authority
IPCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Crimson Orchard Solar and BESS. If you know of one, report it (confidential reports are anonymised).

Has Crimson Orchard Solar and BESS had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Crimson Orchard Solar and BESS; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Crimson Orchard Solar and BESS?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Crimson Orchard Solar and BESS?
7 km north-west of Mountain Home, Elmore County, Idaho, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).