Solar · France
Confidentiel
Operational1.5 MWChecked 6 October 2026
The site
- Technology
- Solar
- Capacity
- 1.5 MW
- Status
- Operational (En service)
- Location
- Lyon 7e Arrondissement, Rhône, Auvergne-Rhône-Alpes, France
- First operating
- 2025
- Network operator
- Enedis
Timeline
- 11 June 2025 Connected to the grid
- 11 June 2025 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Confidentiel. If you know of one, report it (confidential reports are anonymised).
Follow Confidentiel
Get one email when this site's status changes in the Registre national des installations (ODRE, France), or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Incidents at solar farms in France
The register holds 3 incidents at solar farms in France, 3 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Source: Registre national des installations de production et de stockage d'électricité, ODRE (Open Data Réseaux Énergies), Licence Ouverte v2.0 (Etalab). The dataset. The register adds only the incidents and the counts.