Battery storage · United Kingdom

Coldmoorholme Lane Battery Storage

Operator Envirotech Energy Solutions

Application Refused7.2 MWData checked 16 November 2026Source record dated 10 December 2021

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Coldmoorholme Lane Battery Storage is a 7.2 MW battery storage site in Bourne End, Buckinghamshire, United Kingdom. Its planning application (20/08321/FUL) went to Buckinghamshire on 16 December 2020 and was refused on 15 September 2021. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 44 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

709 energy sites within 40 km for Coldmoorholme Lane Battery Storage

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
7.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Envirotech Energy Solutions
Location
Btw Landfill Site, Buckinghamshire, SL8 5PS, United Kingdom
Planning authority
Buckinghamshire
Planning application
20/08321/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/08321/FUL, with what the planning evidence pack adds for this site.

Every application in Buckinghamshire · Alerts for applications and incidents near here

  • 16 December 2020 Planning application submitted
  • 15 September 2021 Planning permission refused

None found. The register holds no published incident that names Coldmoorholme Lane Battery Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Coldmoorholme Lane Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Coldmoorholme Lane Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Coldmoorholme Lane Battery Storage?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 10 December 2021.
Where is Coldmoorholme Lane Battery Storage?
In Bourne End, Buckinghamshire, United Kingdom (postcode SL8 5PS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).