Onshore wind · Spain

Cogote del Quinto wind farm

Planned (permitted)48.8 MWChecked 8 October 2026Last changed in the dataset 5 March 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cogote del Quinto wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
48.8 MW
Status
Planned (permitted) (Pre-construction)
Owner
AMP Energía Eólica Ibérica SL [100%]
Location
San Pedro Manrique, Soria, Castilla y León, Spain

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Cogote del Quinto wind farm. If you know of one, report it (confidential reports are anonymised).