Cochran Limited, Three Trees Road - Solar Panels
Operator Fusion Renewables limited
Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 18 December 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cochran Limited, Three Trees Road - Solar Panels is a 0.5 MW solar farm on the edge of Annan, Dumfries and Galloway, United Kingdom. Its planning application (23/1170/FUL) went to Dumfries and Galloway on 19 June 2023 and was granted on 5 December 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 6 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Cochran Limited, Three Trees Road - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cochran Limited, Three Trees Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2016, Solar panel fire evacuates Hawick High School, 59 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 59 km | Significant |
| EIR-1499 | 2025 | Solar panels linked to fires at council buildings in Northumberland | 108 km | Significant |
| EIR-2721 | 2025 | Solar panel fire breaks out at Shanklea Primary School | 108 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Fusion Renewables limited
- Location
- Cochran Limited, Three Trees Road, Newbie, Dumfries and Galloway, DG12 5QU, United Kingdom
- Planning authority
- Dumfries and Galloway
- Planning application
- 23/1170/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/1170/FUL, with what the planning evidence pack adds for this site.
Every application in Dumfries and Galloway · Alerts for applications and incidents near here
Timeline
- 19 June 2023 Planning application submitted
- 5 December 2023 Planning permission granted
- 5 December 2026 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Cochran Limited, Three Trees Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Cochran Limited, Three Trees Road - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cochran Limited, Three Trees Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Cochran Limited, Three Trees Road - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 December 2023.
- Where is Cochran Limited, Three Trees Road - Solar Panels?
- On the edge of Annan, Dumfries and Galloway, United Kingdom (postcode DG12 5QU).