Offshore wind · United Kingdom

Cluaran Ear-Thuath / Bowdun Wind Farm (Thistle North East) (E3)

Operator Thistle Wind Partners

Application Submitted1,000 MWData checked 16 November 2026Source record dated 13 July 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cluaran Ear-Thuath / Bowdun Wind Farm (Thistle North East) (E3) is a 1,000 MW offshore wind farm 52 km east of Cove, United Kingdom. Its planning application went to Marine Scotland on 6 May 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cluaran Ear-Thuath / Bowdun Wind Farm (Thistle North East) (E3) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 14 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-2700, Repeat Vestas turbine failures hit pioneering floating wind project in Scotland, 179 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-27002026Repeat Vestas turbine failures hit pioneering floating wind project in Scotland179 kmSignificant
EIR-00292024Second blade failure of 2024 at Dogger Bank A offshore wind farm247 kmSignificant
EIR-07582024Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm247 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 11 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Offshore wind
Capacity
1,000 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Thistle Wind Partners
Location
44km offshore from Aberdeen, Offshore, United Kingdom
Planning authority
Marine Scotland
Turbines
67, 359 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Marine Scotland · Alerts for applications and incidents near here

  • 6 May 2026 Planning application submitted

None found. The register holds no published incident that names Cluaran Ear-Thuath / Bowdun Wind Farm (Thistle North East) (E3). If you know of one, report it (confidential reports are anonymised).

Has Cluaran Ear-Thuath / Bowdun Wind Farm (Thistle North East) (E3) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cluaran Ear-Thuath / Bowdun Wind Farm (Thistle North East) (E3); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Cluaran Ear-Thuath / Bowdun Wind Farm (Thistle North East) (E3)?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 13 July 2026.
Where is Cluaran Ear-Thuath / Bowdun Wind Farm (Thistle North East) (E3)?
52 km east of Cove, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).