Climax Molybdenum UK Limited, Needham Road - Solar PV Panels
Operator Climax Molybdenum UK Ltd
Awaiting Construction1.2 MWData checked 16 November 2026Source record dated 3 May 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Climax Molybdenum UK Limited, Needham Road - Solar PV Panels is a 1.2 MW solar farm in Stowmarket, Suffolk, United Kingdom. Its planning application (DC/23/04966) went to Mid Suffolk on 1 November 2023 and was granted on 1 May 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 9 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Climax Molybdenum UK Limited, Needham Road - Solar PV Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Climax Molybdenum UK Limited, Needham Road - Solar PV Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2815, Solar panel on school roof starts primary school fire in Ipswich, 17 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2815 | 2026 | Solar panel on school roof starts primary school fire in Ipswich | 17 km | Significant |
| EIR-2731 | 2021 | Electrical fault in solar panel control unit sparks loft fire in Ipswich | 17 km | Minor |
| EIR-2589 | 2022 | Rooftop solar panels reported to have overheated and sparked fire at Colchester church | 34 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 1.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Climax Molybdenum UK Ltd
- Location
- Climax Molybdenum UK Ltd Needham Road, Suffolk, IP14 2AE, United Kingdom
- Planning authority
- Mid Suffolk
- Planning application
- DC/23/04966
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DC/23/04966, with what the planning evidence pack adds for this site.
Every application in Mid Suffolk · Alerts for applications and incidents near here
Timeline
- 1 November 2023 Planning application submitted
- 1 May 2024 Planning permission granted
- 1 May 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Climax Molybdenum UK Limited, Needham Road - Solar PV Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Climax Molybdenum UK Limited, Needham Road - Solar PV Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Climax Molybdenum UK Limited, Needham Road - Solar PV Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Climax Molybdenum UK Limited, Needham Road - Solar PV Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 May 2024.
- Where is Climax Molybdenum UK Limited, Needham Road - Solar PV Panels?
- In Stowmarket, Suffolk, United Kingdom (postcode IP14 2AE).