Cleve Hill Solar Project

Operator Quinbrook Infrastructure Partners

Operational150 MWData checked 16 November 2026Source record dated 28 July 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Cleve Hill Solar Project is a 150 MW battery storage site 3.2 km north-east of Faversham, Kent, United Kingdom. Its planning application (EN010085) went to The Planning Inspectorate - National Infrastructure on 16 November 2018 and was granted on 28 May 2020. It has been operating since 1 July 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 25 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 2 other sites and 376 energy sites within 40 km for Cleve Hill Solar Project

Members see the sites and incidents around this one, and every record behind them.

10 planned or unplanned unavailability notices published under REMIT, 13 Oct 2026 to 15 Oct 2026. Members see each notice: planned or unplanned, the capacity out, the dates and the cause given.

Contains BMRS data © Elexon Limited copyright and database right. Read each morning; a notice can be withdrawn or revised by the operator.

Technology
Battery storage (Co-located with RE)
Capacity
150 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Quinbrook Infrastructure Partners
Location
Graveney, Whitstable, Kent, ME13 9EE, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010085
First operating
2025

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010085, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 16 November 2018 Planning application submitted
  • 28 May 2020 Planning permission granted
  • 28 May 2020 Planning permission refused
  • 1 April 2023 Construction started
  • 1 July 2025 Operational

None found. The register holds no published incident that names Cleve Hill Solar Project. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Cleve Hill Solar Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cleve Hill Solar Project; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cleve Hill Solar Project?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2025.
Where is Cleve Hill Solar Project?
3.2 km north-east of Faversham, Kent, United Kingdom (postcode ME13 9EE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).