Chosley Farm, North Warnborough Solar Farm and Battery storage

Operator Shell Renewables (CSE23 Limited)

Awaiting ConstructionData checked 16 November 2026Source record dated 27 February 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Chosley Farm, North Warnborough Solar Farm and Battery storage is a battery storage site 4.1 km south of Hook, Hampshire, United Kingdom. Its planning application (20/03185/FUL) went to Hart on 21 January 2021 and was granted on 11 November 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 15 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Chosley Farm, North Warnborough Solar Farm and Battery storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 85 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire85 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction99 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter185 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Shell Renewables (CSE23 Limited)
Location
Chosley Farm Bidden Road North Warnborough Hook, Hampshire, RG29 1BW, United Kingdom
Planning authority
Hart
Planning application
20/03185/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/03185/FUL, with what the planning evidence pack adds for this site.

Every application in Hart · Alerts for applications and incidents near here

  • 21 January 2021 Planning application submitted
  • 11 November 2021 Planning permission granted
  • 11 November 2024 Planning permission expired

None found. The register holds no published incident that names Chosley Farm, North Warnborough Solar Farm and Battery storage. If you know of one, report it (confidential reports are anonymised).

Has Chosley Farm, North Warnborough Solar Farm and Battery storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chosley Farm, North Warnborough Solar Farm and Battery storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chosley Farm, North Warnborough Solar Farm and Battery storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 February 2026.
Where is Chosley Farm, North Warnborough Solar Farm and Battery storage?
4.1 km south of Hook, Hampshire, United Kingdom (postcode RG29 1BW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).