← Back to Berkshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Charters School, Charters Road - Solar Panels

Operator Solar Options for Schools Limited

Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 8 July 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Charters School, Charters Road - Solar Panels is a 0.5 MW solar farm in Sunninghill, Berkshire, United Kingdom. Its planning application (24/01003/CLASSJ) went to Windsor and Maidenhead on 25 April 2024 and was granted on 17 June 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

SOLAR OPTIONS FOR SCHOOLS LIMITED (09812345), active, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Charters School, Charters Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2939, Rooftop solar fire forces West Drayton school to close early, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-29392026Rooftop solar fire forces West Drayton school to close early18 kmSignificant
EIR-15312022Fire involving solar panels damages roof of flats in Fleet19 kmSignificant
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End22 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Solar Options for Schools Limited
Location
Charters School, Charters Road, Sunningdale, Ascot, Berkshire, SL5 9QY, United Kingdom
Planning authority
Windsor and Maidenhead
Planning application
24/01003/CLASSJ

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01003/CLASSJ, with what the planning evidence pack adds for this site.

Every application in Windsor and Maidenhead · Alerts for applications and incidents near here

  • 25 April 2024 Planning application submitted
  • 17 June 2024 Planning permission granted

None found. The register holds no published incident that names Charters School, Charters Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Charters School, Charters Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Charters School, Charters Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Charters School, Charters Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 July 2024.
Where is Charters School, Charters Road - Solar Panels?
In Sunninghill, Berkshire, United Kingdom (postcode SL5 9QY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).