Battery storage · United States

CES Agawam Tuckahoe Solar Hybrid

Operator CES Agawam Tuckahoe Solar LLC

Operational2.6 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

CES Agawam Tuckahoe Solar Hybrid is a 2.6 MW battery storage site 6.4 km west of Agawam, Hampden County, Massachusetts, United States. It first operated in 2021. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 11 other energy sites within 10 km. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 1 other site and 162 energy sites within 40 km for CES Agawam Tuckahoe Solar Hybrid

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (5 MWh)
Capacity
2.6 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
CES Agawam Tuckahoe Solar LLC
Owner
CES Agawam Tuckahoe Solar LLC
Location
Hampden County, Massachusetts, United States
First operating
2021
Balancing authority
ISNE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names CES Agawam Tuckahoe Solar Hybrid. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has CES Agawam Tuckahoe Solar Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names CES Agawam Tuckahoe Solar Hybrid; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of CES Agawam Tuckahoe Solar Hybrid?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is CES Agawam Tuckahoe Solar Hybrid?
6.4 km west of Agawam, Hampden County, Massachusetts, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).