Solar · United Kingdom
Centrica Storage, Dimlington Road - Solar Panels
Operator Centrica Plc Head Office
Application Submitted0.4 MWData checked 16 November 2026Source record dated 18 September 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Centrica Storage, Dimlington Road - Solar Panels is a 0.4 MW solar farm 9.8 km south-east of Withernsea, East Riding of Yorkshire, United Kingdom. Its planning application (26/02280/PVNOT) went to East Riding of Yorkshire on 28 August 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Centrica Storage, Dimlington Road - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Centrica Storage, Dimlington Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 101 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 101 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 203 km | Major |
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 243 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Centrica Plc Head Office
- Location
- Centrica Storage Limited Dimlington Road Easington, East Riding of Yorkshire, HU12 0SX, United Kingdom
- Planning authority
- East Riding of Yorkshire
- Planning application
- 26/02280/PVNOT
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 26/02280/PVNOT, with what the planning evidence pack adds for this site.
Every application in East Riding of Yorkshire · Alerts for applications and incidents near here
Timeline
- 28 August 2026 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Centrica Storage, Dimlington Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Centrica Storage, Dimlington Road - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Centrica Storage, Dimlington Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Centrica Storage, Dimlington Road - Solar Panels?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 18 September 2026.
- Where is Centrica Storage, Dimlington Road - Solar Panels?
- 9.8 km south-east of Withernsea, East Riding of Yorkshire, United Kingdom (postcode HU12 0SX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).