← Back to Maine

Battery storage · United States

CED Denmark Solar Hybrid

Operator Consolidated Edison Development Inc.

Cancelled or postponedData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

CED Denmark Solar Hybrid is a battery storage site 36 km west of Poland, Oxford County, Maine, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is cancelled or postponed. There is one other energy site within 10 km. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 11 other sites and 17 energy sites within 40 km for CED Denmark Solar Hybrid

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage
Status
Cancelled or postponed
Operator
Consolidated Edison Development Inc.
Owner
Consolidated Edison Development Inc.
Location
Oxford County, Maine, United States
Balancing authority
ISNE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names CED Denmark Solar Hybrid. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has CED Denmark Solar Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names CED Denmark Solar Hybrid; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of CED Denmark Solar Hybrid?
Cancelled or postponed, in the U.S. Energy Information Administration, Form EIA-860M.
Where is CED Denmark Solar Hybrid?
36 km west of Poland, Oxford County, Maine, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).