Solar · United Kingdom

Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic

Operator Legoland Windsor Park Limited

Awaiting Construction1.2 MWData checked 16 November 2026Source record dated 21 June 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic is a 1.2 MW solar farm 4.5 km south-west of Windsor, Berkshire, United Kingdom. Its planning application (24/01093/CLAJ14) went to Windsor and Maidenhead on 3 May 2024 and was granted on 6 June 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 66 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2939, Rooftop solar fire forces West Drayton school to close early, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-29392026Rooftop solar fire forces West Drayton school to close early14 kmSignificant
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End14 kmMinor
EIR-07742023Solar panel fire destroys roof of Ealing Council house in Greenford21 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Legoland Windsor Park Limited
Location
Car Park Legoland Windsor Resort, Winkfield Road, Windsor, Berkshire, SL4 4AY, United Kingdom
Planning authority
Windsor and Maidenhead
Planning application
24/01093/CLAJ14

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01093/CLAJ14, with what the planning evidence pack adds for this site.

Every application in Windsor and Maidenhead · Alerts for applications and incidents near here

  • 3 May 2024 Planning application submitted
  • 6 June 2024 Planning permission granted

None found. The register holds no published incident that names Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic. If you know of one, report it (confidential reports are anonymised).

Has Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 21 June 2024.
Where is Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic?
4.5 km south-west of Windsor, Berkshire, United Kingdom (postcode SL4 4AY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).