Around this site

← Back to Santa Cruz

Onshore wind · Argentina

Canadon Leon wind farm

Operational122 MWChecked 8 October 2026Last changed in the dataset 15 June 2022

Technology
Onshore wind
Capacity
122 MW
Status
Operational (Operating)
Operator
YPF Energía Eléctrica
Owner
YPF Energía Eléctrica SA [100%]
Location
Deseado, Santa Cruz, Argentina
First operating
2021

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Canadon Leon wind farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.