Around this site

← Back to Bahia

Solar · Brazil

Campo Largo solar farm

Planned (permitted)308 MWChecked 8 October 2026Last changed in the dataset 11 June 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Campo Largo solar farm sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
308 MW
Status
Planned (permitted) (Pre-construction)
Location
Sento Sé, Região Geográfica Intermediária de Juazeiro, Bahia, Brazil
Phases in the tracker
9

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Campo Largo solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.