Onshore wind · Spain
Campo Alto wind farm
Planned (permitted)32 MWChecked 8 October 2026Last changed in the dataset 6 March 2025
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Campo Alto wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
The site
- Technology
- Onshore wind
- Capacity
- 32 MW
- Status
- Planned (permitted) (Pre-construction)
- Operator
- Iniciativas Eólica de Cantabria
- Location
- Campoo de Yuso, Cantabria, Spain
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Campo Alto wind farm. If you know of one, report it (confidential reports are anonymised).
Follow Campo Alto wind farm
Get one email when this site's status changes in the Global Energy Monitor solar and wind trackers, or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.