Onshore wind · Spain

Campanario (Elawan) wind farm

Planned (permitted)15 MWChecked 8 October 2026Last changed in the dataset 26 March 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Campanario (Elawan) wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
15 MW
Status
Planned (permitted) (Pre-construction)
Operator
Elawan Fotovoltaica Campanario 5
Owner
Elawan Energy SL [100%]
Location
Montealegre del Castillo, Albacete, Castilla-La Mancha, Spain

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Campanario (Elawan) wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.