Solar · United Kingdom

Camerons Brewery, Stockton Street - Solar Panels

Operator E.ON UK Heat Limited · Owner E.On UK Eis Holdings Limited

Revised0.6 MWData checked 16 November 2026Source record dated 25 October 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Camerons Brewery, Stockton Street - Solar Panels is a 0.6 MW solar farm in Hartlepool, Cleveland, United Kingdom. Its planning application (H/2023/0229) went to Hartlepool on 3 July 2023 and was withdrawn on 24 August 2023. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 51 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

E.ON UK HEAT LIMITED (11054698), active, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Camerons Brewery, Stockton Street - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1502, Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre, 24 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre24 kmMinor
EIR-14992025Solar panels linked to fires at council buildings in Northumberland51 kmSignificant
EIR-27212025Solar panel fire breaks out at Shanklea Primary School51 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
E.ON UK Heat Limited
Owner
E.On UK Eis Holdings Limited
Location
Camerons Brewery, Stockton Street, Hartlepool, Cleveland, TS24 7QS, United Kingdom
Planning authority
Hartlepool
Planning application
H/2023/0229

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for H/2023/0229, with what the planning evidence pack adds for this site.

Every application in Hartlepool · Alerts for applications and incidents near here

  • 3 July 2023 Planning application submitted
  • 24 August 2023 Application withdrawn

None found. The register holds no published incident that names Camerons Brewery, Stockton Street - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Camerons Brewery, Stockton Street - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Camerons Brewery, Stockton Street - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Camerons Brewery, Stockton Street - Solar Panels?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 25 October 2023.
Where is Camerons Brewery, Stockton Street - Solar Panels?
In Hartlepool, Cleveland, United Kingdom (postcode TS24 7QS).