Solar · Brazil

CAIÇARA solar project

Planned (permitted)777 MWChecked 8 October 2026Last changed in the dataset 11 June 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for CAIÇARA solar project sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
777 MW
Status
Planned (permitted) (Pre-construction)
Owner
CAIÇARA ENERGIA SPE LTDA (PIE) [100%]
Location
Lagoa dos Patos, Minas Gerais, Brazil
Phases in the tracker
18

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names CAIÇARA solar project. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.