Solar · France
C.VI6V32 - ADP 32 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE CRUCEY-VILLAGES (parc 3.2)
Operational10.1 MWData checked 19 October 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
C.VI6V32 - ADP 32 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE CRUCEY-VILLAGES (parc 3.2) is a 10.1 MW solar farm 13 km west of Vernouillet, Thimert-Gâtelles, Eure-et-Loir, Centre-Val de Loire, France. It first operated in 2013. Its status in the Registre national des installations (ODRE, France) is operational. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 11 incidents at solar farms (hybrid battery and solar sites included) in France, and 480 worldwide.
Get an email when C.VI6V32 - ADP 32 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE CRUCEY-VILLAGES (parc 3.2) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in France. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 10.1 MW
- Capacity figure from
- Registre national des installations (ODRE, France)
- Status
- Operational (En service)
- Location
- Thimert-Gâtelles, Eure-et-Loir, Centre-Val de Loire, France
- First operating
- 2013
- Network operator
- RTE
View on OpenStreetMap (the dataset gives the commune, so the pin is the commune centre). The larger dot is this site; the others are sites within 40 km.
Timeline
- 13 June 2012 Connected to the grid
- 24 June 2013 Operational
Incidents on the register at this site
None found. The register holds no published incident that names C.VI6V32 - ADP 32 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE CRUCEY-VILLAGES (parc 3.2). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has C.VI6V32 - ADP 32 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE CRUCEY-VILLAGES (parc 3.2) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names C.VI6V32 - ADP 32 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE CRUCEY-VILLAGES (parc 3.2); it holds 11 incidents at solar farms (hybrid battery and solar sites included) in France.
- What is the status of C.VI6V32 - ADP 32 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE CRUCEY-VILLAGES (parc 3.2)?
- Operational, in the Registre national des installations (ODRE, France).
- Where is C.VI6V32 - ADP 32 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE CRUCEY-VILLAGES (parc 3.2)?
- 13 km west of Vernouillet, Thimert-Gâtelles, Eure-et-Loir, Centre-Val de Loire, France.
Source: Registre national des installations de production et de stockage d'électricité, ODRE (Open Data Réseaux Énergies), Licence Ouverte v2.0 (Etalab). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).