Operator Regener8 Power Limited

Application Refused350 MWData checked 16 November 2026Source record dated 28 October 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Bury Farm, Dickens Lane - Battery Energy Storage System is a 350 MW battery storage site 4.4 km north-west of Dunstable, Bedfordshire, United Kingdom. Its planning application (CB/25/02044/FULL) went to Central Bedfordshire on 21 July 2025 and was refused on 29 September 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 66 other energy sites within 10 km, 23 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 8 other sites and 625 energy sites within 40 km for Bury Farm, Dickens Lane - Battery Energy Storage System

Members see the sites and incidents around this one, and every record behind them.

REGENER8 POWER LIMITED (11720857), active, since 2018. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
350 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Regener8 Power Limited
Location
Bury Farm, Dickens Lane, Tilsworth, Bedfordshire, LU7 9PX, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/25/02044/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CB/25/02044/FULL, with what the planning evidence pack adds for this site.

Every application in Central Bedfordshire · Alerts for applications and incidents near here

  • 21 July 2025 Planning application submitted
  • 29 September 2025 Planning permission refused

None found. The register holds no published incident that names Bury Farm, Dickens Lane - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Bury Farm, Dickens Lane - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bury Farm, Dickens Lane - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bury Farm, Dickens Lane - Battery Energy Storage System?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 28 October 2025.
Where is Bury Farm, Dickens Lane - Battery Energy Storage System?
4.4 km north-west of Dunstable, Bedfordshire, United Kingdom (postcode LU7 9PX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).