Building ONE

Operator Science Museum Group

Under Construction1.2 MWData checked 16 November 2026Source record dated 1 August 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Building ONE is a 1.2 MW solar farm on the edge of Wroughton, Wiltshire, United Kingdom. Its planning application (S/19/0229) went to Swindon on 19 February 2019 and was granted on 4 June 2019. Construction started on 1 August 2019. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 37 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Building ONE sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2109, Solar installer falls through fragile farm roof at Kemble, suffering brain injuries, 24 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries24 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire24 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol54 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Science Museum Group
Location
Building One Science Museum Gr, Red Barn, Wroughton, Swindon, Wiltshire, Wiltshire, SN4 9LT, United Kingdom
Planning authority
Swindon
Planning application
S/19/0229

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/19/0229, with what the planning evidence pack adds for this site.

Every application in Swindon · Alerts for applications and incidents near here

  • 19 February 2019 Planning application submitted
  • 4 June 2019 Planning permission granted
  • 1 August 2019 Construction started

None found. The register holds no published incident that names Building ONE. If you know of one, report it (confidential reports are anonymised).

Has Building ONE had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Building ONE; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Building ONE?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 August 2019.
Where is Building ONE?
On the edge of Wroughton, Wiltshire, United Kingdom (postcode SN4 9LT).