Planning pack for this site, £295Other options

Solar · United Kingdom

Brunton First School, Roseden Way - Solar Panels

Operator Brunton First School

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 8 September 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Brunton First School, Roseden Way - Solar Panels is a 0.2 MW solar farm on the edge of Wideopen, Tyne And Wear, United Kingdom. Its planning application (2023/0747/01/NPV) went to Newcastle upon Tyne on 3 July 2023 and was granted on 23 August 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 106 other energy sites within 10 km, 74 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Brunton First School, Roseden Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1499, Solar panels linked to fires at council buildings in Northumberland, 7.0 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14992025Solar panels linked to fires at council buildings in Northumberland7.0 kmSignificant
EIR-27212025Solar panel fire breaks out at Shanklea Primary School7.0 kmSignificant
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre46 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Brunton First School
Location
Brunton First School, Roseden Way, Newcastle Upon Tyne, Tyne And Wear, NE13 9BD, United Kingdom
Planning authority
Newcastle upon Tyne
Planning application
2023/0747/01/NPV

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2023/0747/01/NPV, with what the planning evidence pack adds for this site.

Every application in Newcastle upon Tyne · Alerts for applications and incidents near here

  • 3 July 2023 Planning application submitted
  • 23 August 2023 Planning permission granted

None found. The register holds no published incident that names Brunton First School, Roseden Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Brunton First School, Roseden Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Brunton First School, Roseden Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Brunton First School, Roseden Way - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 September 2023.
Where is Brunton First School, Roseden Way - Solar Panels?
On the edge of Wideopen, Tyne And Wear, United Kingdom (postcode NE13 9BD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).