Planning pack for this site, £295Other options

Solar · United Kingdom

Broad Lane, Cawood - Solar Farm & Battery Storage

Operator Quintas Cleantech

Application Submitted49.9 MWData checked 16 November 2026Source record dated 19 September 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Broad Lane, Cawood - Solar Farm & Battery Storage is a 49.9 MW solar farm 6.5 km north-west of Selby, North Yorkshire, United Kingdom. Its planning application (ZG2025/0762/EIA) went to North Yorkshire on 7 August 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 34 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Broad Lane, Cawood - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 79 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells79 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool128 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire241 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Quintas Cleantech
Location
East Of Broad Lane Cawood, North Yorkshire, YO8 3SQ, United Kingdom
Planning authority
North Yorkshire
Planning application
ZG2025/0762/EIA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ZG2025/0762/EIA, with what the planning evidence pack adds for this site.

Every application in North Yorkshire · Alerts for applications and incidents near here

  • 7 August 2025 Planning application submitted

None found. The register holds no published incident that names Broad Lane, Cawood - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Broad Lane, Cawood - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Broad Lane, Cawood - Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Broad Lane, Cawood - Solar Farm & Battery Storage?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 19 September 2025.
Where is Broad Lane, Cawood - Solar Farm & Battery Storage?
6.5 km north-west of Selby, North Yorkshire, United Kingdom (postcode YO8 3SQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).