← Back to Lancashire

Battery storage · United Kingdom

Bramble Croft, Chew Moor Lane - Battery Energy Storage

Operator Private Developer

Application Refused0.2 MWData checked 16 November 2026Source record dated 24 August 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Bramble Croft, Chew Moor Lane - Battery Energy Storage is a 0.2 MW battery storage site in Westhoughton, Lancashire, United Kingdom. Its planning application (00701/26) went to Bolton on 17 April 2026 and was refused on 30 July 2026. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 55 other energy sites within 10 km, 19 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 409 other sites and 787 energy sites within 40 km for Bramble Croft, Chew Moor Lane - Battery Energy Storage

Members see the sites and incidents around this one, and every record behind them.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Private Developer
Location
Opposite 17 Bramble Croft Chew Moor Lane, Lancashire, BL5 3JU, United Kingdom
Planning authority
Bolton
Planning application
00701/26

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 00701/26, with what the planning evidence pack adds for this site.

Every application in Bolton · Alerts for applications and incidents near here

Status changed from Application Submitted to Application Refused on 16 November 2026.

  • 17 April 2026 Planning application submitted
  • 30 July 2026 Planning permission refused

None found. The register holds no published incident that names Bramble Croft, Chew Moor Lane - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Bramble Croft, Chew Moor Lane - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bramble Croft, Chew Moor Lane - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bramble Croft, Chew Moor Lane - Battery Energy Storage?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Bramble Croft, Chew Moor Lane - Battery Energy Storage?
In Westhoughton, Lancashire, United Kingdom (postcode BL5 3JU).