← Back to Lincolnshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Boston West Business Park - Micro Energy Storage

Operator AMP Clean Energy · Owner Aggregated Micro Power Holdings Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 1 September 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Boston West Business Park - Micro Energy Storage is a 0.2 MW battery storage site in Boston, Lincolnshire, United Kingdom. Its planning application (B/26/0105) went to Boston on 27 February 2026 and was granted on 22 April 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 17 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

AMP CLEAN ENERGY LIMITED (11320925), active, since 2018. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Boston West Business Park - Micro Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 74 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells74 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction169 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire190 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
AMP Clean Energy
Owner
Aggregated Micro Power Holdings Limited
Location
Rear of, Boston West Business Park, Sleaford Road, Lincolnshire, PE21 8EG, United Kingdom
Planning authority
Boston
Planning application
B/26/0105

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for B/26/0105, with what the planning evidence pack adds for this site.

Every application in Boston · Alerts for applications and incidents near here

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 27 February 2026 Planning application submitted
  • 22 April 2026 Planning permission granted

None found. The register holds no published incident that names Boston West Business Park - Micro Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Boston West Business Park - Micro Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Boston West Business Park - Micro Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Boston West Business Park - Micro Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Boston West Business Park - Micro Energy Storage?
In Boston, Lincolnshire, United Kingdom (postcode PE21 8EG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).