← Back to California

Battery storage · United States

Border Hybrid Energy Center

Operator CalPeak Power, LLC · Owner CalPeak Power - Border LLC

Operational54.1 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Border Hybrid Energy Center is a 54.1 MW battery storage site 13 km south-east of Bonita, San Diego County, California, United States. It first operated in 2025. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 7 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

58 energy sites within 40 km for Border Hybrid Energy Center

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (54 MWh)
Capacity
54.1 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
CalPeak Power, LLC
Owner
CalPeak Power - Border LLC
Location
San Diego County, California, United States
First operating
2025
Balancing authority
CISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Border Hybrid Energy Center. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Border Hybrid Energy Center had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Border Hybrid Energy Center; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Border Hybrid Energy Center?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Border Hybrid Energy Center?
13 km south-east of Bonita, San Diego County, California, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).