Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Blarghour Wind Farm

Operator Coriolis Energy & ESB

Awaiting Construction84 MWData checked 16 November 2026Source record dated 7 October 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Blarghour Wind Farm is a 84 MW wind farm 24 km south-east of Oban, Argyll and Bute, United Kingdom. Its planning application (EC00005267) went to Scottish Government (S36) on 14 May 2018 and was granted on 29 October 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 8 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Blarghour Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1951, Investigation begins after turbine fire at Ardrossan wind farm, 74 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-19512022Investigation begins after turbine fire at Ardrossan wind farm74 kmSignificant
EIR-11572026Fire destroys turbine at Whitelee windfarm near Glasgow77 kmSignificant
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow81 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
84 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Coriolis Energy & ESB
Location
7km north west of Inveraray and 6km east of Dalavich, Argyll and Bute, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
EC00005267
Turbines
14, 180 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EC00005267, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 14 May 2018 Planning application submitted
  • 29 October 2021 Planning permission granted
  • 29 October 2027 Planning permission runs out

None found. The register holds no published incident that names Blarghour Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Blarghour Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Blarghour Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Blarghour Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 October 2024.
Where is Blarghour Wind Farm?
24 km south-east of Oban, Argyll and Bute, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).