Solar · United Kingdom

Billingbear Solar Farm

Operator WT Energy Limited

Awaiting Construction21.5 MWData checked 16 November 2026Source record dated 29 October 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Billingbear Solar Farm is a 21.5 MW solar farm 4 km south-east of Twyford, Berkshire, United Kingdom. Its planning application (22/02820/FULL) went to Windsor and Maidenhead on 18 October 2022 and was granted on 26 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 25 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Billingbear Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1519, Solar panels involved in outbuilding roof fire in Bourne End, 16 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End16 kmMinor
EIR-15312022Fire involving solar panels damages roof of flats in Fleet22 kmSignificant
EIR-29392026Rooftop solar fire forces West Drayton school to close early24 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
21.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
WT Energy Limited
Location
S/O Valentines, The Straight Mile, Shurlock Row, Reading, Berkshire, RG10 0QN, United Kingdom
Planning authority
Windsor and Maidenhead
Planning application
22/02820/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/02820/FULL, with what the planning evidence pack adds for this site.

Every application in Windsor and Maidenhead · Alerts for applications and incidents near here

  • 18 October 2022 Planning application submitted
  • 26 July 2024 Planning permission granted
  • 26 July 2027 Planning permission runs out

None found. The register holds no published incident that names Billingbear Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Billingbear Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Billingbear Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Billingbear Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 October 2024.
Where is Billingbear Solar Farm?
4 km south-east of Twyford, Berkshire, United Kingdom (postcode RG10 0QN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).