Solar · United Kingdom
Billingbear Solar Farm
Operator WT Energy Limited
Awaiting Construction21.5 MWData checked 16 November 2026Source record dated 29 October 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Billingbear Solar Farm is a 21.5 MW solar farm 4 km south-east of Twyford, Berkshire, United Kingdom. Its planning application (22/02820/FULL) went to Windsor and Maidenhead on 18 October 2022 and was granted on 26 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 25 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Billingbear Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Billingbear Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1519, Solar panels involved in outbuilding roof fire in Bourne End, 16 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1519 | 2025 | Solar panels involved in outbuilding roof fire in Bourne End | 16 km | Minor |
| EIR-1531 | 2022 | Fire involving solar panels damages roof of flats in Fleet | 22 km | Significant |
| EIR-2939 | 2026 | Rooftop solar fire forces West Drayton school to close early | 24 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 21.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- WT Energy Limited
- Location
- S/O Valentines, The Straight Mile, Shurlock Row, Reading, Berkshire, RG10 0QN, United Kingdom
- Planning authority
- Windsor and Maidenhead
- Planning application
- 22/02820/FULL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/02820/FULL, with what the planning evidence pack adds for this site.
Every application in Windsor and Maidenhead · Alerts for applications and incidents near here
Timeline
- 18 October 2022 Planning application submitted
- 26 July 2024 Planning permission granted
- 26 July 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Billingbear Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Billingbear Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Billingbear Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Billingbear Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 October 2024.
- Where is Billingbear Solar Farm?
- 4 km south-east of Twyford, Berkshire, United Kingdom (postcode RG10 0QN).