BESS Facility Development in Killeter is a 82 MW battery storage site 24 km north-west of Dromore, Strabane, United Kingdom. Its planning application (LA11/2024/0745/F) went to Derry City and Strabane on 20 September 2024 and was withdrawn on 26 June 2025. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 13 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 1 other site and 123 energy sites within 40 km for BESS Facility Development in Killeter

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
82 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Green Frog Power (Gort BESS) Limited
Location
Lands 100m South West of Magherakeel, 110kV Substation Shannaghy Road, Killeter, Strabane, BT81 7HB, United Kingdom
Planning authority
Derry City and Strabane
Planning application
LA11/2024/0745/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA11/2024/0745/F, with what the planning evidence pack adds for this site.

Every application in Derry City and Strabane · Alerts for applications and incidents near here

  • 20 September 2024 Planning application submitted
  • 26 June 2025 Application withdrawn

None found. The register holds no published incident that names BESS Facility Development in Killeter. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has BESS Facility Development in Killeter had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names BESS Facility Development in Killeter; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of BESS Facility Development in Killeter?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2025.
Where is BESS Facility Development in Killeter?
24 km north-west of Dromore, Strabane, United Kingdom (postcode BT81 7HB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).