Battery storage · United Kingdom
BESS Facility Development in Killeter
Operator Green Frog Power (Gort BESS) Limited
Application Withdrawn82 MWData checked 16 November 2026Source record dated 5 August 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
BESS Facility Development in Killeter is a 82 MW battery storage site 24 km north-west of Dromore, Strabane, United Kingdom. Its planning application (LA11/2024/0745/F) went to Derry City and Strabane on 20 September 2024 and was withdrawn on 26 June 2025. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 13 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when BESS Facility Development in Killeter changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 82 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Green Frog Power (Gort BESS) Limited
- Location
- Lands 100m South West of Magherakeel, 110kV Substation Shannaghy Road, Killeter, Strabane, BT81 7HB, United Kingdom
- Planning authority
- Derry City and Strabane
- Planning application
- LA11/2024/0745/F
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA11/2024/0745/F, with what the planning evidence pack adds for this site.
Every application in Derry City and Strabane · Alerts for applications and incidents near here
Timeline
- 20 September 2024 Planning application submitted
- 26 June 2025 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names BESS Facility Development in Killeter. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has BESS Facility Development in Killeter had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names BESS Facility Development in Killeter; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of BESS Facility Development in Killeter?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2025.
- Where is BESS Facility Development in Killeter?
- 24 km north-west of Dromore, Strabane, United Kingdom (postcode BT81 7HB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).