Battery storage · United Kingdom
Berfern Farm
Operator Capbal
Planning Permission Expired5 MWData checked 16 November 2026Source record dated 24 July 2020
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Berfern Farm is a 5 MW battery storage site 6.5 km south-east of Dunoon, Inverclyde, United Kingdom. Its planning application (18/0144/IC) went to Inverclyde on 14 May 2018. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 17 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Berfern Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
CAPBAL LIMITED (SC519076), active, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Expired
- Operator or applicant
- Capbal
- Location
- Berfern Farm, Finnockbog Road, Inverkip, Greenock, Strathclyde, Inverclyde, PA16 0DA, United Kingdom
- Planning authority
- Inverclyde
- Planning application
- 18/0144/IC
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 18/0144/IC, with what the planning evidence pack adds for this site.
Every application in Inverclyde · Alerts for applications and incidents near here
Timeline
- 14 May 2018 Planning application submitted
- 7 August 2021 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Berfern Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Berfern Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Berfern Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Berfern Farm?
- Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 24 July 2020.
- Where is Berfern Farm?
- 6.5 km south-east of Dunoon, Inverclyde, United Kingdom (postcode PA16 0DA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).