Solar · United Kingdom

Belazu Ingredient Company, Long Drive - Solar panels

Operator Columbia Threadneedle Investments Limited · Owner Ameriprise Financial Inc.

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 29 October 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Belazu Ingredient Company, Long Drive - Solar panels is a 0.3 MW solar farm in Northolt, London, United Kingdom. Its planning application (243243PAPV) went to Ealing on 21 August 2024 and was granted on 21 October 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 133 other energy sites within 10 km, 97 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

COLUMBIA THREADNEEDLE INVESTMENTS UK INTERNATIONAL LIMITED (13324807), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Belazu Ingredient Company, Long Drive - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0774, Solar panel fire destroys roof of Ealing Council house in Greenford, 1.3 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07742023Solar panel fire destroys roof of Ealing Council house in Greenford1.3 kmMajor
EIR-11702025Rooftop solar panels catch fire at IKEA store in Wembley5.5 kmSignificant
EIR-29392026Rooftop solar fire forces West Drayton school to close early8.7 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Columbia Threadneedle Investments Limited
Owner
Ameriprise Financial Inc.
Location
Belazu Ingredient Company, 74 Long Drive, Greenford, London, UB6 8LZ, United Kingdom
Planning authority
Ealing
Planning application
243243PAPV

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 243243PAPV, with what the planning evidence pack adds for this site.

Every application in Ealing · Alerts for applications and incidents near here

  • 21 August 2024 Planning application submitted
  • 21 October 2024 Planning permission granted

None found. The register holds no published incident that names Belazu Ingredient Company, Long Drive - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has Belazu Ingredient Company, Long Drive - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Belazu Ingredient Company, Long Drive - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Belazu Ingredient Company, Long Drive - Solar panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 October 2024.
Where is Belazu Ingredient Company, Long Drive - Solar panels?
In Northolt, London, United Kingdom (postcode UB6 8LZ).