← Back to Nouvelle-Aquitaine

Energy sites / France / Nouvelle-Aquitaine

Solar · France

BEAUREGARD

Operational5.9 MWChecked 6 October 2026

Technology
Solar
Capacity
5.9 MW
Status
Operational (En service)
Location
Caudecoste, Lot-et-Garonne, Nouvelle-Aquitaine, France
First operating
2025
Network operator
Enedis

View on OpenStreetMap (the dataset gives the commune, so the pin is the commune centre). The larger dot is this site; the others are sites within 40 km.

  • 9 December 2025 Connected to the grid
  • 9 December 2025 Operational

None found. The register holds no published incident that names BEAUREGARD. If you know of one, report it (confidential reports are anonymised).

The register holds 3 incidents at solar farms in France, 3 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Registre national des installations de production et de stockage d'électricité, ODRE (Open Data Réseaux Énergies), Licence Ouverte v2.0 (Etalab). The dataset. The register adds only the incidents and the counts.