Battery storage · United Kingdom
Battery Energy Storage System Facility Development in Pomeroy
Operator Green Frog Power (Tremoge) Limited
Awaiting Construction48 MWData checked 16 November 2026Source record dated 13 July 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Battery Energy Storage System Facility Development in Pomeroy is a 48 MW battery storage site 15 km west of Cookstown, Co. Fermanagh & Omagh, United Kingdom. Its planning application (LA10/2025/0207/F) went to Mid Ulster on 25 February 2025 and was granted on 17 June 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 30 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Battery Energy Storage System Facility Development in Pomeroy changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Battery Energy Storage System Facility Development in Pomeroy sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 297 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 297 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 417 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 465 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 48 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Green Frog Power (Tremoge) Limited
- Location
- Lands Approximately 120m S.W. of Tremoge SubStn. &, Approximately 73m Nw/o Tremoge, Pomeroy, Co. Fermanagh & Omagh, BT70 2SX, United Kingdom
- Planning authority
- Mid Ulster
- Planning application
- LA10/2025/0207/F
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA10/2025/0207/F, with what the planning evidence pack adds for this site.
Every application in Mid Ulster · Alerts for applications and incidents near here
Timeline
- 25 February 2025 Planning application submitted
- 17 June 2026 Planning permission granted
- 17 June 2031 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Battery Energy Storage System Facility Development in Pomeroy. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Battery Energy Storage System Facility Development in Pomeroy had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Battery Energy Storage System Facility Development in Pomeroy; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Battery Energy Storage System Facility Development in Pomeroy?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 July 2026.
- Where is Battery Energy Storage System Facility Development in Pomeroy?
- 15 km west of Cookstown, Co. Fermanagh & Omagh, United Kingdom (postcode BT70 2SX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).