Battery storage · United Kingdom
Barlow Road, Barlow - Battery Storage
Operator Vox Energy Limited
Revised50 MWData checked 16 November 2026Source record dated 19 November 2021
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Barlow Road, Barlow - Battery Storage is a 50 MW battery storage site in Selby, North Yorkshire, United Kingdom. Its planning application (2021/1154/FUL) went to North Yorkshire on 8 November 2021 and was withdrawn on 18 October 2022. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 52 other energy sites within 10 km, 31 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Barlow Road, Barlow - Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
VOX ENERGY LIMITED (08823485), active, since 2013. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Barlow Road, Barlow - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 73 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 73 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 130 km | Major |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 236 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 50 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Vox Energy Limited
- Location
- Home Farm Barlow Road Barlow, North Yorkshire, YO8 8FX, United Kingdom
- Planning authority
- North Yorkshire
- Planning application
- 2021/1154/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2021/1154/FUL, with what the planning evidence pack adds for this site.
Every application in North Yorkshire · Alerts for applications and incidents near here
Timeline
- 8 November 2021 Planning application submitted
- 18 October 2022 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Barlow Road, Barlow - Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Barlow Road, Barlow - Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Barlow Road, Barlow - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Barlow Road, Barlow - Battery Storage?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 19 November 2021.
- Where is Barlow Road, Barlow - Battery Storage?
- In Selby, North Yorkshire, United Kingdom (postcode YO8 8FX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).