Solar · Germany
Banzendorf Northwest solar farm
Owner Statkraft AS
Planned (permitted)178 MWData checked 8 October 2026Source record dated 31 October 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Banzendorf Northwest solar farm is a 178 MW solar farm 12 km east of Neuruppin, Ostprignitz-Ruppin, Brandenburg, Germany. It first operated in 2028. Its status in the Global Energy Monitor solar and wind trackers is planned (permitted). There are 4 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 8 incidents at solar farms (hybrid battery and solar sites included) in Germany, and 480 worldwide.
Get an email when Banzendorf Northwest solar farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Banzendorf Northwest solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 8 comparable solar incidents in Germany, nearest first. The nearest is EIR-2998, Solar panel system burns on roof of Werneuchen house, 62 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2998 | 2026 | Solar panel system burns on roof of Werneuchen house | 62 km | Significant |
| EIR-2879 | 2026 | Fire at German home with photovoltaic roof tiles injures firefighter | 331 km | Significant |
| EIR-2629 | 2024 | Fire breaks out in technical room of Hesse solar park | 344 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 178 MW
- Capacity figure from
- Global Energy Monitor solar and wind trackers
- Status
- Planned (permitted) (Pre-construction)
- Owner
- Statkraft AS
- Location
- Ostprignitz-Ruppin, Brandenburg, Germany
- First operating
- 2028
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Banzendorf Northwest solar farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Banzendorf Northwest solar farm had a fire or other incident?
- None is on the register as of 22 November 2026. The register holds no published incident that names Banzendorf Northwest solar farm; it holds 8 incidents at solar farms (hybrid battery and solar sites included) in Germany.
- What is the status of Banzendorf Northwest solar farm?
- Planned (permitted), in the Global Energy Monitor solar and wind trackers, where it last changed on 31 October 2025.
- Where is Banzendorf Northwest solar farm?
- 12 km east of Neuruppin, Ostprignitz-Ruppin, Brandenburg, Germany.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).