← Back to California

Battery storage · United States

Baldy Mesa 2_Silver Peak Hybrid

Operator AES Clean Energy

Operational25 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Baldy Mesa 2_Silver Peak Hybrid is a 25 MW battery storage site 5 km north-west of Adelanto, San Bernardino County, California, United States. It first operated in 2024. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 14 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 84 other sites and 51 energy sites within 40 km for Baldy Mesa 2_Silver Peak Hybrid

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (100 MWh)
Capacity
25 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
AES Clean Energy
Owner
AES Clean Energy
Location
San Bernardino County, California, United States
First operating
2024
Balancing authority
CISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Baldy Mesa 2_Silver Peak Hybrid. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Baldy Mesa 2_Silver Peak Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Baldy Mesa 2_Silver Peak Hybrid; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Baldy Mesa 2_Silver Peak Hybrid?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Baldy Mesa 2_Silver Peak Hybrid?
5 km north-west of Adelanto, San Bernardino County, California, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).