Solar · Türkiye

Baglar Hybrid solar farm

Operational26 MWChecked 8 October 2026Last changed in the dataset 26 June 2024

Technology
Solar
Capacity
26 MW
Status
Operational (Operating)
Owner
Bağlar Elektrik Üretim AS [100%]
Location
Selçuklu, Konya, Türkiye
First operating
2024

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Baglar Hybrid solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.