Planning pack for this site, £295Other options

Solar · United States

Asheville Solar

Operator Duke Energy Progress - (NC)

Under construction9.5 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Asheville Solar is a 9.5 MW solar farm 5.8 km north-west of Fletcher, Buncombe County, North Carolina, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 5 other energy sites within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Asheville Solar sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1641, Solar panel fire put out on Asheville Chamber of Commerce roof, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-16412026Solar panel fire put out on Asheville Chamber of Commerce roof14 kmMinor
EIR-14582026Fire reported on solar panels at a home in Ballantyne160 kmMinor
EIR-10942021Solar farm fire in North Carolina reported as under investigation318 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
9.5 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
Duke Energy Progress - (NC)
Owner
Duke Energy Progress - (NC)
Location
Buncombe County, North Carolina, United States
Expected
2026
Balancing authority
CPLW

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Asheville Solar. If you know of one, report it (confidential reports are anonymised).

Has Asheville Solar had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Asheville Solar; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Asheville Solar?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Asheville Solar?
5.8 km north-west of Fletcher, Buncombe County, North Carolina, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).