Arnold Clark Motorstore, Meltham Lane - Solar Panels

Operator Arnold Clark Automobiles Head Office

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 12 May 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Arnold Clark Motorstore, Meltham Lane - Solar Panels is a 0.2 MW solar farm in Chesterfield, Derbyshire, United Kingdom. Its planning application (CHE/25/00125/SOLPAN) went to Chesterfield on 4 March 2025 and was granted on 24 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 54 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Arnold Clark Motorstore, Meltham Lane - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 38 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster38 kmSignificant
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent54 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall54 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Arnold Clark Automobiles Head Office
Location
Arnold Clark Motorstore, Meltham Lane, Chesterfield, Derbyshire, S41 7LG, United Kingdom
Planning authority
Chesterfield
Planning application
CHE/25/00125/SOLPAN

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CHE/25/00125/SOLPAN, with what the planning evidence pack adds for this site.

Every application in Chesterfield · Alerts for applications and incidents near here

  • 4 March 2025 Planning application submitted
  • 24 April 2025 Planning permission granted
  • 24 April 2030 Planning permission runs out

None found. The register holds no published incident that names Arnold Clark Motorstore, Meltham Lane - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Arnold Clark Motorstore, Meltham Lane - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Arnold Clark Motorstore, Meltham Lane - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Arnold Clark Motorstore, Meltham Lane - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2025.
Where is Arnold Clark Motorstore, Meltham Lane - Solar Panels?
In Chesterfield, Derbyshire, United Kingdom (postcode S41 7LG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).